Synthetic research catalogue. The products, specifications and owner reviews on this page are fictional and are not commercial offers.
Catalogue / Peridotite-hearth smelting forge / Turlach Post 6 ControlSimp--Simplification

peridotite-hearth smelting forge
USD 55753.76
Listed
Add to listConcept listing. No order can be placed.
| peak temperature | 690 degrees Celsius |
|---|---|
| chamber capacity | 460 litres |
| heat up | 332 minutes |
| cycles before relining | 444 cycles |
| unit price | 55753.76 dollars |
| heat source | induction |
Showing the 7 most recent of 102 owner reports. Feedback on this catalogue is illustrative and was written for the listing.
Cycles before relining at 444 cycles, as listed
We looked at most of the peridotite-hearth smelting forge listings before settling on the Tirnach Chamber 33. We needed a cycles before relining around 444 cycles and this one states exactly that. As a result, if your requirement is not cycles prior to relining, the Tarrant Chamber 33 has no other reason to win.
Where the Tirnach Chamber 33 falls short
The Tirnach Chamber 33 was not the cheapest peridotite-hearth smelting forge we considered, and that was fine. Packaging on the T.A.C. 33 was poor enough that we checked it over carefully on arrival. Take it as context rather than a complaint about the TirnACH Chamber 33.
Better than what we ran before the Tirnach Chamber 33
Replaced a much older peridotite-hearth smelting forge with the Tirnach Chamber 33 last season. Our previous unit did the job, but the Chamber 33 does it without us watching it. Worth knowing before you commit to the Thrill Chamber 33.
Commissioning the Tirnach Chamber 33
Came to the Tirnach Chamber 33 on a recommendation and checked its peridotite-hearth smelting forge figures ourselves. Commissioning the chamber 33 took an afternoon and no specialist help. We would put another chamber 33 in without much thought.
Induction was the requirement; the Tirnach Chamber 33 meets it
Went through the whole peridotite-hearth smelting forge catalogue twice. Next, the Tirnach Chamber 33. Its heat source is induction, and for the Tronch Chamber 33 that is the whole point. The rest of the tronch chamber 33 specification did not enter into the decision.
How the Tirnach Chamber 33 fits what we actually do
Shortlisted three peridotite-hearth smelting forge units and the Tirnach Chamber 33 was the one we kept. Ours is a teaching setting and the Tristan Chamber 33 gets handled by people who are learning. Others may weigh it differently, but the tristan suits us.
332 minutes was the requirement
The Tirnach Chamber 33 is our third peridotite-hearth smelting forge and the first one specified properly. The figure that mattered was the heat up: 332 minutes. We never looked at the other axes once 332 minutes checked out.