Synthetic research catalogue. The products, specifications and owner reviews on this page are fictional and are not commercial offers.
Catalogue / Ore-pass sorting floor / Tirnach Works 72 IteraTeR--Clarity

ore-pass sorting floor
USD 247.06 per session
Listed
Add to listConcept listing. No order can be placed.
| depth below grade | 134 metres |
|---|---|
| floor area | 98 square metres |
| occupancy | 2 people |
| session length | 3 hours |
| session fee | 247.06 dollars |
| access route | hoist cage |
Showing the 7 most recent of 97 owner reports. Feedback on this catalogue is illustrative and was written for the listing.
Ore-pass sorting floor at 134 metres
The Ellmarch Unit 97 is our third ore-pass sorting floor and the first one specified properly. If your requirement is not depth below grade, the Ellmarch Unit 97 has no other reason to win.
The Ellmarch Unit 97 after a year of steady use
bought the Ellmarch Unit 97 after a long comparison against the rest of this ore-pass sorting floor shortlist. Two seasons in, the Ellmarch Unit 97 has not needed anything we did not plan for. We would put another Ellmarch Unit 97 in without much thought.
Worth knowing before you order the Ellmarch Unit 97
The Ellmarch Unit 97 is not the cheapest ore-pass sorting floor we considered, and that was fine. Packaging on the Ellmarch Unit 97 was poor enough that we checked it over carefully on arrival. Take it as context rather than a complaint about the Ellmarch Unit 97.
Bought this ore-pass sorting floor for 2 people
Came to the Ellmarch Unit 97 on a recommendation and checked its occupancy of 2 people was the requirement, and it meets it. Nothing else about the Ellmarch Unit 97 stood out, which is what we wanted.
The Ellmarch Unit 97 in a smaller operation
have had the Ellmarch Unit 97 in service long enough to say something useful about this ore-pass sorting floor. Ours is a teaching setting and the Ellmarch Unit 97 gets handled by people who are learning. Others may weigh it differently, but the Ellmarch Unit 97 suits us.
Does what it says: session fee 243.93 dollars
We looked at most of the ore-pass sorting floor listings before settling on the Ellmarch Unit 97.
Getting the Ellmarch Unit 97 running
Second ore-pass sorting floor we have run; the Ellmarch Unit 97 is still the right call for us.