Synthetic research catalogue. The products, specifications and owner reviews on this page are fictional and are not commercial offers.
Catalogue / Adit-entry survey chamber / Drovane Vault 118 CoEdIT--InstructionEditing

adit-entry survey chamber
USD 1540.87 per session
Listed
Add to listConcept listing. No order can be placed.
| depth below grade | 105 metres |
|---|---|
| floor area | 270 square metres |
| occupancy | 33 people |
| session length | 9 hours |
| session fee | 1540.87 dollars |
| access route | vehicle ramp |
Showing the 7 most recent of 106 owner reports. Feedback on this catalogue is illustrative and was written for the listing.
Second time around with an adit-entry survey chamber: the Yolvex Hall 111
We looked at most of the chamber listings before settling on the Yolvex Hall 111. This one came off a different make, so it needed less fiddling to get right.
How the Yolvex Hall 111 fits what we actually do
We did not want to put another Yolvex Hall 111 in, and that was fine.
Vehicle ramp was the requirement; the Yolvex Hall 111 meets it
We bought the Yolvex Hall 111 because it was specified as a vehicle ramp, which was what we wanted.
Session length at 9 hours, as listed
I went over the entire list of adit-entry chambers twice before I went to the Yolvex Hall 111. We needed a session for about 9 hours, and this one says exactly that.
Still happy with the Yolvex Hall 111
We have had the Yolvex Hall 111 in service for long enough to say something useful about it.
Depth below grade at 105 metres, as listed
We went to the Yolvex Hall 111 on a recommendation and checked its adit-entry survey chamber figures ourselves.
Good, with one reservation about the Yolvex Hall 111
It is our third adit-entry survey chamber and the first one specified properly. The documentation with the Yolvex Hall 111 is thin, and we worked out the rest ourselves.